Back to Standards/Criterion 4.1.3
Surveyor Consensus & Allocation Dispute
Team leader to resolve
Lead SurveyorDr Mohd Anis HaronAssigned Service Standard Lead
Rating SurveyorFully met
Mr Ganesh PillaiRecorded finding during tracer inspection

Awaiting Dr Mohd Anis Haron (Lead Surveyor) resolution. Dual surveyor observations are recorded with full provenance and decided strictly by clinical leadership authority.

4.1.3Core StandardSafety Standard
Facilities and equipment

Planned Preventive Maintenance (PPM) of Medical Equipment

Medical devices undergo scheduled planned preventive maintenance (PPM) and performance calibration in accordance with manufacturer specifications.

Compliance Criteria

  • 1Annual PPM master schedule with designated calibration frequencies
  • 2Current PPM inspection stickers attached to all active clinical devices
  • 3PPM completion rate exceeding 95% threshold across clinical departments
  • 4Electrical safety testing (EST) records in compliance with IEC 62353

Hospital Self-Rating

Rated by En. Hakim Osman on 16 Jan 2026

Evidence frozen on 30 March 2026 (14 days before survey)

"Planned preventive maintenance achieved 97.2% overall compliance in 2025. Electrical safety testing is performed on all active clinical assets."

AccrediSense Intelligence
thin

Evidence documents establish procedural intent but lack documented verification records for the current audit period.

Unverified criteria:
  • PPM completion rate exceeding 95% threshold across clinical departments
  • Electrical safety testing (EST) records in compliance with IEC 62353
Derived from AccrediSense Evidence Engine · 1 document(s) attached with 2 unverified criteriaGovernance disclosure (1.4.1.4)

Evidence Documents (1)

Audit reportAcceptedScore: 95/100

Planned Preventive Maintenance (PPM) & Electrical Safety Testing Verification

44 pages · ENValid: 2025-01-01 to 2026-12-31

Linked Performance Indicators (1)

PI-04-001Biomedical Engineering

Critical Life-Support Biomedical Equipment Planned Preventive Maintenance (PPM) Rate

18 readings recorded (Target: >= 95%)
HO
Person-in-ChargeHead of Facilities & Biomedical Engineering
Head of DepartmentHead of Facilities & Biomedical Engineering
HO
Surveyor Authority PaneAssigned: Mr. Ganesh Pillai (Engineering & Facilities Surveyor)

Surveyor Rating

Committed 14 Apr 2026

PPM adherence is high with 97.2% completion rate. Physical inspection of defibrillators, ventilators and infusion pumps confirmed valid PPM calibration stickers.

Ensure electrical safety testing logs are cross-referenced on ward-level service tags.

Continue excellent preventive maintenance standards.