Hospital Seri Damai · Cycle 3 (2022–2026)
ROI & impact
Hours returned per cycle
9,240 h
FTE freed
1.3 FTE
Value returned
MYR 831k
Return multiple
2.2×
Payback
22.2 months
1Your profile
Licensed beds
268
In-scope standards
31
Criteria
509
Cycle
Cycle 3 (2022–2026)
Certificate expires
30 Sep 2026
Adopted AccrediSense
8 Dec 2025
Published benchmark: a later-cycle hospital spends about EUR 223 per bed per cycle — for 268 beds that is EUR 59,764. Accreditation overall runs at 0.03%–0.60% of operating cost per year .
2What the cycle costs your team today
baseline = 2.5 FTE × 1,800 h × 4 years + 8 h × 31 standards × 48 months
= 18,000 h + 11,904 h = 29,904 h3Where AccrediSense Intelligence gives time back
- Standards self-ratingOpen module
Rates each criterion against its linked evidence and flags where a self-rating outruns it.
From the record 509 criteria across 31 in-scope standards
AssumptionShare of effort0%40%AssumptionReduction0%90%2,093 h
per cycle
- Evidence collection & reuseOpen module
A document is linked once and reused across every criterion it supports.
From the record 38 evidence items on record
AssumptionShare of effort0%40%AssumptionReduction0%90%1,884 h
per cycle
- Gap analysis & readinessOpen module
Surfaces criteria where practice and evidence disagree before the evidence freeze.
AssumptionShare of effort0%40%AssumptionReduction0%90%897 h
per cycle
- Policy architectOpen module
Refuses to attach a policy without its training record, and names the missing item.
From the record 14 policies on record
AssumptionShare of effort0%40%AssumptionReduction0%90%897 h
per cycle
- Indicators & PiC drillsOpen module
Run charts update from readings; each person in charge rehearses explaining their indicator.
From the record 34 indicators on the register
AssumptionShare of effort0%40%AssumptionReduction0%90%748 h
per cycle
- SIQ timelines & RCAOpen module
Tracks each serious incident clock and structures the root cause analysis.
From the record 3 SIQ cases on record
AssumptionShare of effort0%40%AssumptionReduction0%90%837 h
per cycle
- Safety goalsOpen module
Maps each national safety goal to its criteria, indicators and evidence.
From the record 7 national safety goals mapped
AssumptionShare of effort0%40%AssumptionReduction0%90%449 h
per cycle
- Survey rehearsal & divergence resolutionOpen module
Works through each self-rating a surveyor may read differently, before the survey.
From the record 23 self-ratings the surveyor reads differently
AssumptionShare of effort0%40%AssumptionReduction0%90%598 h
per cycle
- Post-survey recommendation closureOpen module
Tracks each survey recommendation to closure with its evidence linked.
AssumptionShare of effort0%40%AssumptionReduction0%90%837 h
per cycle
4Protecting the certificate
exposure avoided = (25% − 10%) × (3 × MYR 500,000 + 600 h × MYR 65)
= MYR 230,8505Realised since adoption
Months in use
4.2
Since 8 Dec 2025
Hours already returned
810 h
Value already returned
MYR 53k
6Your four-year return
Cumulative accreditation hours across the cycle
Hours returned, lever by lever
Illustrative model. Every assumption is marked and editable; nothing here is a quote. AccrediSense does not change how MSQH rates a criterion — it changes how long it takes your team to be ready for that rating.
