Hospital Seri Damai · Cycle 3 (2022–2026)

ROI & impact

What AccrediSense returns to Hospital Seri Damai across a four-year MSQH cycle . Every figure is sourced, read from your record, or a marked assumption you can change.

Hours returned per cycle

Assumption

9,240 h

31% of 29,904 h

FTE freed

Assumption

1.3 FTE

Across the four-year cycle

Value returned

Assumption

MYR 831k

MYR 601k time · MYR 231k exposure

Return multiple

Assumption

2.2×

On MYR 384k over four years

Payback

Assumption

22.2 months

Months from adoption

1Your profile

Read from your hospital record.
From the record

Licensed beds

268

From the record

In-scope standards

31

From the record

Criteria

509

From the record

Cycle

Cycle 3 (2022–2026)

From the record

Certificate expires

30 Sep 2026

From the record

Adopted AccrediSense

8 Dec 2025

Published benchmark: a later-cycle hospital spends about EUR 223 per bed per cycle — for 268 beds that is EUR 59,764. Accreditation overall runs at 0.03%–0.60% of operating cost per year .

2What the cycle costs your team today

The accreditation workload AccrediSense works against.
Assumption
Quality team
0.0 FTE6.0 FTE
Assumption
PiC hours per standard per month
0 h24 h
baseline = 2.5 FTE × 1,800 h × 4 years + 8 h × 31 standards × 48 months
         = 18,000 h + 11,904 h = 29,904 h

3Where AccrediSense Intelligence gives time back

Each lever takes a share of the baseline and a reduction. Shares are normalised, so they need not add to 100.
Preset
Assumption
  • Standards self-ratingOpen module

    Rates each criterion against its linked evidence and flags where a self-rating outruns it.

    From the record 509 criteria across 31 in-scope standards

    Assumption
    Share of effort
    0%40%
    Assumption
    Reduction
    0%90%

    2,093 h

    per cycle

  • Evidence collection & reuseOpen module

    A document is linked once and reused across every criterion it supports.

    From the record 38 evidence items on record

    Assumption
    Share of effort
    0%40%
    Assumption
    Reduction
    0%90%

    1,884 h

    per cycle

  • Gap analysis & readinessOpen module

    Surfaces criteria where practice and evidence disagree before the evidence freeze.

    Assumption
    Share of effort
    0%40%
    Assumption
    Reduction
    0%90%

    897 h

    per cycle

  • Policy architectOpen module

    Refuses to attach a policy without its training record, and names the missing item.

    From the record 14 policies on record

    Assumption
    Share of effort
    0%40%
    Assumption
    Reduction
    0%90%

    897 h

    per cycle

  • Indicators & PiC drillsOpen module

    Run charts update from readings; each person in charge rehearses explaining their indicator.

    From the record 34 indicators on the register

    Assumption
    Share of effort
    0%40%
    Assumption
    Reduction
    0%90%

    748 h

    per cycle

  • SIQ timelines & RCAOpen module

    Tracks each serious incident clock and structures the root cause analysis.

    From the record 3 SIQ cases on record

    Assumption
    Share of effort
    0%40%
    Assumption
    Reduction
    0%90%

    837 h

    per cycle

  • Safety goalsOpen module

    Maps each national safety goal to its criteria, indicators and evidence.

    From the record 7 national safety goals mapped

    Assumption
    Share of effort
    0%40%
    Assumption
    Reduction
    0%90%

    449 h

    per cycle

  • Survey rehearsal & divergence resolutionOpen module

    Works through each self-rating a surveyor may read differently, before the survey.

    From the record 23 self-ratings the surveyor reads differently

    Assumption
    Share of effort
    0%40%
    Assumption
    Reduction
    0%90%

    598 h

    per cycle

  • Post-survey recommendation closureOpen module

    Tracks each survey recommendation to closure with its evidence linked.

    Assumption
    Share of effort
    0%40%
    Assumption
    Reduction
    0%90%

    837 h

    per cycle

4Protecting the certificate

Your record today: award status Delayed, certificate expires 30 Sep 2026. Core 47/48 · Safety 22/22 · Overall 463/509, 16 not yet rated.
Assumption
Chance of a delayed award, without
0%60%
Assumption
Chance of a delayed award, with
0%60%
Assumption
Months of lapse if it happens
0 mo12 mo
Assumption
Re-survey and rework hours
0 h2000 h
exposure avoided = (25% − 10%) × (3 × MYR 500,000 + 600 h × MYR 65)
                 = MYR 230,850

5Realised since adoption

Straight-line accrual from the day you adopted AccrediSense to today. Move the date in the demo controls to watch it build.
From the record

Months in use

4.2

Since 8 Dec 2025

Hours already returned

Assumption

810 h

Value already returned

Assumption

MYR 53k

Of which before the survey: 810 h

6Your four-year return

Cumulative accreditation hours across the cycle

Without AccrediSenseWith AccrediSense

Hours returned, lever by lever

Illustrative model. Every assumption is marked and editable; nothing here is a quote. AccrediSense does not change how MSQH rates a criterion — it changes how long it takes your team to be ready for that rating.